location
project sector
project owner
size
The work includes the construction of a new elevated raw water intake pump station. The project is designed with an intake structure in the Mississippi River, dual 36” gravity feed piping to the pump station and discharge piping systems to force the raw water over the levee to the existing water treatment plant. The pump station well-structure will require a steel sheet pile cofferdam with walers and strut bracing. Other work includes the re-building of East Cuevas St, adding an extension to Avenue F, milling and asphalt overlay of a portion of Board St, watermain extensions, process pipe modifications, site improvements in the batture, and demolition of the existing raw water pump station.
our blog
Lorem ipsum is placeholder text commonly used in the graphic, print, and publishing
LEMOINE provides a full suite of services, from Infrastructure to Building Construction, Disaster Services, and comprehensive Project and Program Services, all with one call. We are uniquely qualified to be your partner through every stage of any project.
© LEMOINE. ALL RIGHTS RESERVED. | Privacy Policy | Terms & Conditions