location
project sector
project owner
size
The Water Treatment Plant project includes the installation of three water wells, service pumps, two 500,000-gallon bolted galvanized steel ground storage tanks, six pressure filter tanks, chlorine (CL2) chemical systems, yard piping, minor site work, structural fill, grading, drainage systems, and limestone paving. The Chemical Building features a combination of CMU (concrete masonry unit) and pre-engineered metal building construction, while the Filter Building and Service Pump Station Buildings are designed as pre-engineered metal structures. The accompanying photo shows the recently completed Cecilia Water Treatment Plant, which closely aligns with the construction requirements for the Milton Plant.
our blog
Lorem ipsum is placeholder text commonly used in the graphic, print, and publishing
LEMOINE provides a full suite of services, from Infrastructure to Building Construction, Disaster Services, and comprehensive Project and Program Services, all with one call. We are uniquely qualified to be your partner through every stage of any project.
© LEMOINE. ALL RIGHTS RESERVED. | Privacy Policy | Terms & Conditions