our portfolio

Reserve Wastewater Treatment Pond Capacity Expansion

Work with us

location

Reserve, LA

project sector

Wastewater Treatment

project owner

St. John the Baptist Parish

size

10 AC

This project entails expanding the current Reserve Pond WWTP, incorporating a new pond, Headworks addition, pumps, piping, and electrical systems. Significant sitework for the new pond includes moving 118,000 cubic yards of excavated material onsite and importing 36,500 cubic yards of clay for levee compaction. Process equipment comprises four static screens, six dewatering press conveyors, fourteen floating aerators, three 200 HP submersible pumps, a new plant water system, chemical feed system, and weir gates.
LEMOINE successfully completed an expansion at this site in the spring of 2018 and looks forward to strengthening our partnership with St. John the Baptist Parish.

our blog

Lemoine News

Lorem ipsum is placeholder text commonly used in the graphic, print, and publishing

get started

We understand the critical importance of building and maintaining high performance, cost efficient infrastructure. Our team of experts offers out of the box solutions and delivers the results you expect. We get it right the first time. Let’s get started today.

get started

50 years of construction experience, industry resources, and superior talent form the bedrock of the ONE LEMOINE philosophy. Our service lines deliberately connect to support the full building lifecycle, leveraging our expertise every step of the way.

LEMOINE provides a full suite of services, from Infrastructure to Building Construction, Disaster Services, and comprehensive Project and Program Services, all with one call. We are uniquely qualified to be your partner through every stage of any project. 

© LEMOINE. ALL RIGHTS RESERVED.  |  Privacy Policy  |  Terms & Conditions