location
project sector
project owner
size
This project entails expanding the current Reserve Pond WWTP, incorporating a new pond, Headworks addition, pumps, piping, and electrical systems. Significant sitework for the new pond includes moving 118,000 cubic yards of excavated material onsite and importing 36,500 cubic yards of clay for levee compaction. Process equipment comprises four static screens, six dewatering press conveyors, fourteen floating aerators, three 200 HP submersible pumps, a new plant water system, chemical feed system, and weir gates.
LEMOINE successfully completed an expansion at this site in the spring of 2018 and looks forward to strengthening our partnership with St. John the Baptist Parish.
our blog
Lorem ipsum is placeholder text commonly used in the graphic, print, and publishing
LEMOINE provides a full suite of services, from Infrastructure to Building Construction, Disaster Services, and comprehensive Project and Program Services, all with one call. We are uniquely qualified to be your partner through every stage of any project.
© LEMOINE. ALL RIGHTS RESERVED. | Privacy Policy | Terms & Conditions