location
project sector
project owner
size
This project included the replacement of pumps and all electrical components at the existing influent pump station. Construction of a new WWTP, including: elevated headworks structure, cat-in-place concrete SBR structure which included two process equipment sides and a digester, CIP concrete chlorine disinfection structure, elevated electrical equipment platform, and cast-in-place concrete effluent pump station. Yard piping systems, site improvements, tie-ins with existing influent & effluent forcemains, precast and timber piling were also included in the scope.
our blog
Lorem ipsum is placeholder text commonly used in the graphic, print, and publishing
LEMOINE provides a full suite of services, from Infrastructure to Building Construction, Disaster Services, and comprehensive Project and Program Services, all with one call. We are uniquely qualified to be your partner through every stage of any project.
© LEMOINE. ALL RIGHTS RESERVED. | Privacy Policy | Terms & Conditions