our portfolio

Southeast Wastewater Treatment Plant

Work with us

location

Hammond, Louisiana

project sector

Wastewater Treatment

project owner

City of Hammond

size

3,000 CYD Cut + 8,000 CYD Excavation

Major earthwork includes a 30,000 cubic yard cut & fill operation, sludge transfer, filling of existing ponds, 8,000 cubic yards of structural excavation and backfill/berm construction. Efficient design of a single cast in place concrete structure includes two clarifiers, four aeration cells, two digester cells; this structure includes 1,280 cubic yards of concrete. Process includes a cast in place headworks structure with screening and grit removal capability, UV disinfection, blowers, sludge pumping and sludge storage equipment. Site improvements include site drainage, site concrete and limestone roads. Tie-ins with existing force mains and extension of such to new headworks. Electrical and control systems.

our blog

Lemoine News

Lorem ipsum is placeholder text commonly used in the graphic, print, and publishing

get started

We understand the critical importance of building and maintaining high performance, cost efficient infrastructure. Our team of experts offers out of the box solutions and delivers the results you expect. We get it right the first time. Let’s get started today.

get started

50 years of construction experience, industry resources, and superior talent form the bedrock of the ONE LEMOINE philosophy. Our service lines deliberately connect to support the full building lifecycle, leveraging our expertise every step of the way.

LEMOINE provides a full suite of services, from Infrastructure to Building Construction, Disaster Services, and comprehensive Project and Program Services, all with one call. We are uniquely qualified to be your partner through every stage of any project. 

© LEMOINE. ALL RIGHTS RESERVED.  |  Privacy Policy  |  Terms & Conditions